碾压施工质量实时监控系统在南水北调中线工程(新郑南段)高填方段的应用

来源 :北京农业 | 被引量 : 0次 | 上传用户:toforworld
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
南水北调中线工程总干渠新郑南段起点位于长葛市与新郑市交界处,设计桩号SH(3)115+348.7,终点位于新郑市城关乡王刘庄村双洎河渡槽进口前150.000 m处,设计桩号SH(3)131+531.4。渠段线路总长16.183 km,其中明渠长15.190 km,建筑物长0.993 km。共布置各类建筑物28座,其中:河渠交叉2座,渠渠交叉1座,左岸排水7座,铁路交叉1座,公路桥7座,生产桥9座,控制建筑物(退水闸)1座。 The starting point of the Xinzhengnan Section of the Middle Route of the South-to-North Water Diversion Project is located at the junction of Changge City and Xinzheng City with the design of SH (3) 115 + 348.7 and its end point is 150.000 m before the entrance of the Shuangba River aqueduct in Wang Liuzhuang Village, Chengguan Township, Stake SH (3) 131 + 531.4. The total length of the canal segment is 16.183 km, of which the open channel length is 15.190 km and the length of the building is 0.993 km. A total of 28 buildings of various types are arranged, of which 2 are canal ditches, 1 canal ditch, 7 drainages on the left bank, 1 railway crossing, 7 road bridges, 9 production bridges and control buildings (retreat gates) 1 seat.
其他文献
随着我国新农村建设事业的不断推进,农业生产的现代化水平,成为新农村建设有效性的标志之一。农业机械作为农业现代化的硬件设备,在推动农业生产高效性、产业化的过程中,发挥着重
期刊
石漫滩大坝混凝土工程从1994年4月开始浇筑,1997年底竣工验收。2000年前后大坝下游面及廊道内严重渗水,且廊道边墙上挂有大片白色或浅黄色溶出物,对大坝安全运行构成一定威胁
期刊
期刊
本研究以藏北嵩草(Kobresia littledalei)上附着的乳酸菌为研究对象,分离得到肠膜明串珠菌肠膜亚种两株,融合魏斯氏茵11株,食物魏斯氏菌6株,然后对这3种试验菌进行不同温度及
期刊
期刊
大坝的施工技术对于整个水利施工来说是非常重要的,同时水库大坝的安全监测直接关系到整个水利工程能否顺利进行。大坝的安全监测是人们对大坝运行状态和安全状况了解的有效
期刊