摘要:随着经济的发展,社会的进步,建筑工程建设项目越来越多,土建工程也渗入了很多新元素。土建施工是一项系统复杂的项目,而在土建工程项目工作的实践中,在建筑电气安装过程中存在着一些质量问题,由此降低了建筑建设的水平。本文基于工作中的具体实践,从建筑电气工程施工的各个环节出发,分析了土建工程中电气安装的问题和不足,以期为建筑电气工程的顺利进行提供参考。
关键词:土建工程;电气安装;电气施工
Abstract: along with the development of the economy, the progress of the society, more and more construction engineering construction projects, civil engineering is making its way into many new elements. Civil engineering construction is a complex system project, and in the practice of civil engineering projects, in the process of building electrical installation has some quality problems, thus reducing the level of the construction of the building. In this paper, based on the concrete practice in the work, from all aspects of building electrical engineering construction, analyzes the problems and deficiency of electrical installation in civil engineering, in order to provide references for the smooth construction of the electrical engineering.
Key words: civil engineering; Electrical installation; Electrical construction
中图分类号:S972.7+4 文献标识码: A文章编号:
电气安装是土建工程中的重要组成部分,电气安装的建设质量直接关系到建筑整体功能性的发挥,由此做好电气工程的质量管理尤为重要。目前在土建工程电气安装的实践中仍有着不足,影响着建筑质量。
土建工程中电器安装的问题
在土建工程项目工作的实践中,在建筑电气安装过程中,会出现的问题如:电缆、母线安装不符合规定;防雷接地、总等电位及局部等电位施工不到位;电线管预埋和敷设不符合规定;导线、连接线质量和色标不符合规定;配电箱的配线、安装不符合规定;开关、插座盒和面板方面的问题;灯具、吊扇安装、位置不符合要求;电缆、母线安装不符合要求;电话、电视系统的敷线、面板接线不符合规定等等。
出现以上问题的原因主要是:有设计图纸方面的原因,也有选购材料和安装过程中的问题。当然电气施工人员在安装各阶段中专业知识的缺少和责任心的欠缺也是其中主要的原因之一。要想从根本上解决这些问题就要详细的分析这类问题及其出现的原因,并且找到可行的方案来处理这些问题,才能达到保证施工质量和保障用户用电安全的目的。
二、提高土建工程电气安装上的措施方法
1、在施工准备环节的控制。为了保证建设工程的顺利进行,要充分做好施工前的准备,图纸是施工阶段的前提和依据,只有详细消化图纸,对工程每一系统做到心中有数,才能在现场发现问题和纠正错误,做到对工程质量的预控。电气工程系统设备先进、管线繁锁。在电气施工前的每一阶段,都要仔细地审图和校图,特别是对每一份设计修改通知单,都要认真地进行管理,逐一描绘到蓝图上。只有这样,才能保证系统的安全性、正确性和质量可靠性。认真熟悉、会审图纸,了解施工内容及设计意图,明确此项工程所采用的设备和材料,明确图纸所呈现的施工要求,明确电气工程和主体工程以及其他安装工程的交叉配合,以便在实际过程中及早发现采取相应的措施,确保在施工过程中不破坏主体建筑的结构,以防与其它工程位置发生冲突。土建施工前,电气安装人员应会同土建施工技术人员共同审核土建和电气施工图纸,以防遗漏和发生差错,并向施工班组人员做好技术交底,电气工人应该学会看懂土建施工图纸,了解土建施工进度计划和施工方法,并仔细地校核自己准备采用的电气安装方法能否和这一项目的土建施工相适应。
2、在基础施工环节的控制。在基础工程施工时,应及时配合土建做好强、弱电专业的进户电缆穿墙管及止水挡板的预留预埋工作。这一工作要求电专业应赶在土建做墙体防水处理之前完成,避免电气施工破坏防水层造成墙体今后渗漏;对需要预埋的铁件、吊卡、木砖、吊杆基础螺栓及配电柜基础型钢等预埋件,电气施工人员应配合土建,提前做好准备,土建施工到位及时埋入,不得遗漏。电气施工安装中,管理人员只有努力提高自身的素质和专业能力,才能把好质量关。
3、在主体施工环节的控制。作为施工人员,首先必须分清工程中的重点环节。在电气质量监控中,确定配电装置、电力电缆、配电箱三个重点设备交接协调环节,明确关键,制订措施,根据规范进行超前监控,达到对工程质量的预控。其次,必须在监控好重点环节后以点带面,促进整个系统工程的质量控制。电气工程除了设备材料的质量外,还要与土建工程紧密配合,设计的放雷接地点管桩主钢筋与承台受力钢筋及结构柱主筋连接应符合《建筑电气工程施工质量验收规范GB50303-2002》。 施工的组织设计就是一系列的施工流程,对施工各种人力、材料和设备做好协调管理,从而保证施工后续进行的顺利,保证工期和施工的质量。除此之外,施工的组织设计要做好施工的技术交底,技术人员要对施工过程中可能越到的情况对施工人员进行说明,保证后续施工过程中施工人员对电气工程概况的了解,只有这样,才能保证施工的有条不紊。
三、土建工程电气安装施工质量控制的技术要点
1严格按照图纸规范实施。图纸是施工的前提和依据,只有详细核对图纸,对工程中各系统做到心中有数,才能发现问题和纠正错误,做到对工程质量的预控。
2科学进行建筑电气安装工程施工。在施工的过程中,涉及多项操作,由此在每项施工操作中都要做好施工的管理。针对管线敷设要做好质量的控制。管线一般多敷设于吊顶、隔墙内侧以及管道井内,由此一旦造成施工的质量问题,不仅影响工程质量,返工也很麻烦,会造成拖延工期的后果。所以在施工的过程中,就要注重管线敷设的效果,预埋电线管不能敷设在钢筋的外侧,管路在一处的交叉不能超过三条,不能把线管绑扎在一起。在线管的连接中,要注重连接的工艺,保证连接的牢固性,防止接头的脱落。管连接的方法一般分为分插入法和套管法,不论哪种方法的使用都要注意管子要粘连牢固,防止质量瑕疵的出现,保证施工的质量,保证建筑效益水平的发挥。如根据用电设备位置,确定管线走向、标高及开关、插座的位置;电源线配线时,所用导线截面积应满足用电设备的最大输出功率;暗线敷设必须配管。当管线长度超过15m或有两个直角弯时,应增设拉线盒,等等。
3、熟悉规范,把好电气设备质量关。建筑电气设备安装工程,所用材料、电器、设备、成品、半成品的铬牌、型号、规格、性能和施工工藝安装质量,必须符合设计要求和《建筑电气工程施工质量验收规范GB50303-2002》及有关专业规范、标准。电气施工质量规范条文较多,控制人员要结合工程实际边干边学,不断积累,牢记规范条例。该送检复试的材料及配件必须在见证员见证下做好送检工作,只有严禁伪劣产品用于工程,才能保证电气施工工程的安全。
4、积极实施质量目标的预控。以项目为单位确定一名监管责任人,分清工程中的重点环节,凡事有预则明,有明则清。在控制中,一定要根据合同仔细推敲,严格管理,实现系统应具备的功能,成为分项的优质工程。电气施工安装工程中,施工工程师只有努力提高自身的素质和专业能力,才能做好电气工程质量的控制。
建筑电气安装是一项技术性很强,影响因素较复杂的工程,在安装过程中的多种问题都影响其安装质量和进度。但是只要施工单位在施工前做好充分的技术准备,施工中严格按照国家规范,严格执行质量控制程序,施工质量是可以得到保证的。
参考文献:
【1】杨光臣.建筑电气工程施工.重庆大学出版社
【2】郎禄平,郎娟。电气安装工程造价[M],机械工业出版社,2007-09
【3】苏阳。浅析工程中常用的电气安装施工方法和技术[J],科技资讯,2012年13期
【4】马俊鸿。浅谈建筑工程电气安装施工[J],四川建材,2010年第6期
关键词:土建工程;电气安装;电气施工
Abstract: along with the development of the economy, the progress of the society, more and more construction engineering construction projects, civil engineering is making its way into many new elements. Civil engineering construction is a complex system project, and in the practice of civil engineering projects, in the process of building electrical installation has some quality problems, thus reducing the level of the construction of the building. In this paper, based on the concrete practice in the work, from all aspects of building electrical engineering construction, analyzes the problems and deficiency of electrical installation in civil engineering, in order to provide references for the smooth construction of the electrical engineering.
Key words: civil engineering; Electrical installation; Electrical construction
中图分类号:S972.7+4 文献标识码: A文章编号:
电气安装是土建工程中的重要组成部分,电气安装的建设质量直接关系到建筑整体功能性的发挥,由此做好电气工程的质量管理尤为重要。目前在土建工程电气安装的实践中仍有着不足,影响着建筑质量。
土建工程中电器安装的问题
在土建工程项目工作的实践中,在建筑电气安装过程中,会出现的问题如:电缆、母线安装不符合规定;防雷接地、总等电位及局部等电位施工不到位;电线管预埋和敷设不符合规定;导线、连接线质量和色标不符合规定;配电箱的配线、安装不符合规定;开关、插座盒和面板方面的问题;灯具、吊扇安装、位置不符合要求;电缆、母线安装不符合要求;电话、电视系统的敷线、面板接线不符合规定等等。
出现以上问题的原因主要是:有设计图纸方面的原因,也有选购材料和安装过程中的问题。当然电气施工人员在安装各阶段中专业知识的缺少和责任心的欠缺也是其中主要的原因之一。要想从根本上解决这些问题就要详细的分析这类问题及其出现的原因,并且找到可行的方案来处理这些问题,才能达到保证施工质量和保障用户用电安全的目的。
二、提高土建工程电气安装上的措施方法
1、在施工准备环节的控制。为了保证建设工程的顺利进行,要充分做好施工前的准备,图纸是施工阶段的前提和依据,只有详细消化图纸,对工程每一系统做到心中有数,才能在现场发现问题和纠正错误,做到对工程质量的预控。电气工程系统设备先进、管线繁锁。在电气施工前的每一阶段,都要仔细地审图和校图,特别是对每一份设计修改通知单,都要认真地进行管理,逐一描绘到蓝图上。只有这样,才能保证系统的安全性、正确性和质量可靠性。认真熟悉、会审图纸,了解施工内容及设计意图,明确此项工程所采用的设备和材料,明确图纸所呈现的施工要求,明确电气工程和主体工程以及其他安装工程的交叉配合,以便在实际过程中及早发现采取相应的措施,确保在施工过程中不破坏主体建筑的结构,以防与其它工程位置发生冲突。土建施工前,电气安装人员应会同土建施工技术人员共同审核土建和电气施工图纸,以防遗漏和发生差错,并向施工班组人员做好技术交底,电气工人应该学会看懂土建施工图纸,了解土建施工进度计划和施工方法,并仔细地校核自己准备采用的电气安装方法能否和这一项目的土建施工相适应。
2、在基础施工环节的控制。在基础工程施工时,应及时配合土建做好强、弱电专业的进户电缆穿墙管及止水挡板的预留预埋工作。这一工作要求电专业应赶在土建做墙体防水处理之前完成,避免电气施工破坏防水层造成墙体今后渗漏;对需要预埋的铁件、吊卡、木砖、吊杆基础螺栓及配电柜基础型钢等预埋件,电气施工人员应配合土建,提前做好准备,土建施工到位及时埋入,不得遗漏。电气施工安装中,管理人员只有努力提高自身的素质和专业能力,才能把好质量关。
3、在主体施工环节的控制。作为施工人员,首先必须分清工程中的重点环节。在电气质量监控中,确定配电装置、电力电缆、配电箱三个重点设备交接协调环节,明确关键,制订措施,根据规范进行超前监控,达到对工程质量的预控。其次,必须在监控好重点环节后以点带面,促进整个系统工程的质量控制。电气工程除了设备材料的质量外,还要与土建工程紧密配合,设计的放雷接地点管桩主钢筋与承台受力钢筋及结构柱主筋连接应符合《建筑电气工程施工质量验收规范GB50303-2002》。 施工的组织设计就是一系列的施工流程,对施工各种人力、材料和设备做好协调管理,从而保证施工后续进行的顺利,保证工期和施工的质量。除此之外,施工的组织设计要做好施工的技术交底,技术人员要对施工过程中可能越到的情况对施工人员进行说明,保证后续施工过程中施工人员对电气工程概况的了解,只有这样,才能保证施工的有条不紊。
三、土建工程电气安装施工质量控制的技术要点
1严格按照图纸规范实施。图纸是施工的前提和依据,只有详细核对图纸,对工程中各系统做到心中有数,才能发现问题和纠正错误,做到对工程质量的预控。
2科学进行建筑电气安装工程施工。在施工的过程中,涉及多项操作,由此在每项施工操作中都要做好施工的管理。针对管线敷设要做好质量的控制。管线一般多敷设于吊顶、隔墙内侧以及管道井内,由此一旦造成施工的质量问题,不仅影响工程质量,返工也很麻烦,会造成拖延工期的后果。所以在施工的过程中,就要注重管线敷设的效果,预埋电线管不能敷设在钢筋的外侧,管路在一处的交叉不能超过三条,不能把线管绑扎在一起。在线管的连接中,要注重连接的工艺,保证连接的牢固性,防止接头的脱落。管连接的方法一般分为分插入法和套管法,不论哪种方法的使用都要注意管子要粘连牢固,防止质量瑕疵的出现,保证施工的质量,保证建筑效益水平的发挥。如根据用电设备位置,确定管线走向、标高及开关、插座的位置;电源线配线时,所用导线截面积应满足用电设备的最大输出功率;暗线敷设必须配管。当管线长度超过15m或有两个直角弯时,应增设拉线盒,等等。
3、熟悉规范,把好电气设备质量关。建筑电气设备安装工程,所用材料、电器、设备、成品、半成品的铬牌、型号、规格、性能和施工工藝安装质量,必须符合设计要求和《建筑电气工程施工质量验收规范GB50303-2002》及有关专业规范、标准。电气施工质量规范条文较多,控制人员要结合工程实际边干边学,不断积累,牢记规范条例。该送检复试的材料及配件必须在见证员见证下做好送检工作,只有严禁伪劣产品用于工程,才能保证电气施工工程的安全。
4、积极实施质量目标的预控。以项目为单位确定一名监管责任人,分清工程中的重点环节,凡事有预则明,有明则清。在控制中,一定要根据合同仔细推敲,严格管理,实现系统应具备的功能,成为分项的优质工程。电气施工安装工程中,施工工程师只有努力提高自身的素质和专业能力,才能做好电气工程质量的控制。
建筑电气安装是一项技术性很强,影响因素较复杂的工程,在安装过程中的多种问题都影响其安装质量和进度。但是只要施工单位在施工前做好充分的技术准备,施工中严格按照国家规范,严格执行质量控制程序,施工质量是可以得到保证的。
参考文献:
【1】杨光臣.建筑电气工程施工.重庆大学出版社
【2】郎禄平,郎娟。电气安装工程造价[M],机械工业出版社,2007-09
【3】苏阳。浅析工程中常用的电气安装施工方法和技术[J],科技资讯,2012年13期
【4】马俊鸿。浅谈建筑工程电气安装施工[J],四川建材,2010年第6期