我矿于一九七八年九月透水淹井。经多次强排无效,后改用注浆堵水获得成功.一九七八年九月,一井南上山150米处,掘进头放炮透水淹井。实测涌水量1200吨出小时.水点在煤层顶板灰岩 (C_3L_1—2)中,出水口宽度约10厘米长60厘米。最高静水位十182米,水温19℃,出水点均和石炭系9层灰岩间以及奥陶系灰岩间有水力联系.出水后先后强排水七次,共进行105天.排出总水量300万吨以上,耗用资金218万元,使用水
My mine flooded the well in September 1978. After repeated invalidation, it turned out to be successful with grouting and water blocking. In September 1978, a well head south of the mountain was found 150 meters above sea level. The measured water inflow 1200 tons out of hours water point in the coal seam roof limestone (C_3L_1-2), the outlet width of about 10 cm long and 60 cm. The highest static water level of 182 meters, water temperature 19 ℃, the water point and the Carboniferous 9 limestone and the Ordovician limestone between the hydraulic connection has strong drainage seven times after a total of 105 days to discharge the total water 300 More than 10,000 tons, consumption of 2.18 million yuan of funds, the use of water