论文部分内容阅读
随着社会主义建设事业的不断发展,对硫、钴已产生了愈加迫切的需要。为此,我矿在回收主要金属产品铁、铜的同时对回收原矿中所含有的硫钴相应采取了一些改进措施。在车间党总支和支部领导下,以小型和半工业性试验的结果为依据,已将生产中原先混合浮选铜、硫(钴与硫共生在一起)的流程,改为优先浮选铜,继之再回收硫钴的流程。1975年6月,为增大硫钴的生产能力,经过由工人、干部、工程技术人员组成的三结合队伍对二选设备进行了一系列配套改造后,使二选车间重新投入了硫钴生产。
With the continuous development of socialist construction, there has been an ever-greater need for sulfur and cobalt. To this end, my mine in the recovery of major metals products of iron and copper at the same time recovery of cobalt and ore contained in the corresponding measures taken to improve. Under the leadership of the party branch and the branch of the workshop, based on the results of small-scale and semi-industrial tests, the process of mixing the flotation copper and sulfur (symbiosis of cobalt and sulfur together) in the Central Plains has been changed to flotation of copper , Followed by the recovery of sulfur and cobalt flow. In June 1975, in order to increase the production capacity of sulfur and cobalt, after a series of complementary transformation of the second-choice equipment through the three-in-one team of workers, cadres and engineers, the second choice workshop was put back into production of sulfur and cobalt .