Risk assessment of bridge schemes comparison in ecological landscape zone at the preliminary design

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:zxtx001209
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  In the preliminary design phase of the bridge,there are many uncertainties and unforeseen factors,such as site condition,design,construction technology,operating environment,the actual vehicle load and other aspects.Combined with the natural conditions of the site,project plan,functional requirements and the views of the Ministry of Transportation and regulations,the framework of risk assessment for bridges in ecological zones is proposed in this paper.Major risk factors,which are environmental risk,design risk,construction risk and operational management risk,are studies in the paper,which includes multi-level dynamic risk identification,quantification,analysis and evaluation,risk control.Safety risk assessment of Huanglong bridge,as an example,is studies in this frame of risk assessment in the preliminary design stage,which is useful for the relevant decision-making departments.
其他文献
铁路施工过程中发现不少地质灾害,增加工程造价和运营维护成本,这与铁路地质选线阶段尚缺乏有效手段定量评估潜在地质灾害对线路的危险性有直接关系.本文基于区域地质灾害时
本文结合兰州至乌鲁木齐第二双线段的线路气候特点提出对弹条、铁垫板的防腐方式为静电喷涂,螺旋道钉和平垫圈的防腐方式为镀锌加保护防腐措施,解决了气候对扣件系统带来的不
位于大型城市的铁路枢纽,具有完善的客货运线站设备,利用其富余能力开行市郊列车不仅仅是对铁路资源的充分利用,在完善大型城市轨道交通体系、优化轨道交通资源利用、配合并
针对变电所不能够识别和切除"T"接方式的专用线接触网故障等问题,设计了一种新型接触网开关站,具有快速切除永久性故障、自动重合闸功能,能够区分临时性故障、按照允许时间自
  Expansion joints are responsible for a significant proportion of the costs in the maintenance of bridges.Their acquisition costs are not more than 1% of the
会议
  Structural design and evaluation require information on future maximum loads and load effects to cover the intended life span of the structure.For civil str
会议
  This paper describes the monitoring scheme developed to observe the structural behavior of a steel bridge on river Santa Maria.
会议
  When structures are exposed to dynamic loads,they basically respond to the introduced energy by vibrating.Recent progress in new materials has resulted in p
会议
集装箱超重曾导致许多重大事故发生,日益增多外贸集装箱运输量,增加了诱发船舶安全事故的风险,2016年6月6日,交通运输部下发了关于执行《1974年国际海上人命安全公约》第Ⅵ/2
  Nowadays,the health monitoring systems of bridge structures in many countries have collected a large number of structural response data in the long-term mon
会议