论文部分内容阅读
The cutting work of the slurry shield lithotripter when driving forward,the secondary crushing of the large solitary stone and the shock of the stone on the mud-water pipe lead to the vibration and shock phenomenon of the lithotripter in the starting and crushing stages,the fatigue life and tunneling efficiency of shield machine are affected.