Study on Settlement of Railway Embankment on Deep Completely Decomposed Granite Ground with Centrifu

来源 :高速铁路、线路工程设计理论、施工及养护技术国际学术会议 | 被引量 : 0次 | 上传用户:lcc2451
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The settlement control of high-speed railway is a key technology of the embankment engineering.In allusion to the engineering characteristic of deep completely decomposed granite ground in east surround passenger railway of Hainan,based on a set of centrifuge model tests,studied the embankment settlements of ground untreated,dynamic compaction and reinforced by cement-mixed pile,reached the relationship between settlement and time,including settlement during and post-construction.It was indicated that:Weibull model can describe the relationship between embankment settlement and time.The settlements are to meet the requirements of code.
其他文献
  目前中国高速铁路路基压实质量检测指标综合了世界各国高速铁路路基压实指标。为了研究适合中国实际的高速铁路路基压实检测指标,进行了中德击实试验和现场压实试验,并收集
  桩网结构路基是路基的一种加固方法。本文主要应用FLAC3D数值计算软件,基于高低2种路堤,8种不同的桩间距,对桩网结构路基的分层填筑和列车的运营进行了数值计算,分析表明
  铁路客运系统符合灰色系统的特征,本文基于GM(1,1)模型用不同长度数列建模预测我国2005-2007年的铁路客运量,并检测所建模型,对不合格模型用指数加权平均法校正。预测结
  根据桥上无缝道岔受力和变形特点,建立了道岔-桥梁-墩台一体化计算模型,利用有限元法对模型求解。以浙赣线湄池1号大桥为例,分析了桥上无缝道岔的受力与变形的特性,测试了桥
Taking a longitudinal continuous ballastless turnout on LeiDa bridge on Wuhan-Guangzhou Passenger dedicated Line(PDL,in China)for instance,an integral finite el
通过室内土质路基无砟轨道基床模型试验的研究,分析了在分级静载和分级循环加载的条件下,降雨前、后基床的静、动态力学特性.试验表明,无论是静响应还是动态响应在基床横断面
为分析桩网复合地基的垫层效应,进行了四组不同桩帽尺寸的桩网复合地基现场试验,测试了路堤荷载作用下的地基沉降、基底压力和垫层筋带拉力等数据.结果表明:①在桩顶处设置桩
In this paper,the double-row prestressed anchor piles on a site are used as the project background,FLAC3D procedures is used to establish the three-dimensional
The top-mounted dividable pile-board structure subgrade is a new type of high speed railway line structure crossing weak foundation.The train loading can lead t
Crushed stone grouting pile is a new composite soft-base processing technology that combined the gravel pile with grouting technique.The design theory of contro