When TBM is used in long tunnels under the environment of high mountains and deep valleys,confining pressure is one of the important factors that influence TBM tunneling.Based on the three-dimensional
【机 构】
:
西南交通大学 交通隧道工程教育部重点实验室,土木工程学院
论文部分内容阅读
When TBM is used in long tunnels under the environment of high mountains and deep valleys,confining pressure is one of the important factors that influence TBM tunneling.Based on the three-dimensional particle discrete element method,a multi-disc-cutters rotary cutting rock model is established,the difference between the forces of cutters and the crack propagation of the rock under different confining pressures is analyzed further.Taking typical sandstone in Chongqing area as the rock sample,disc cutter forces and rock crack propagation are analyzed under 1,5 and 10MPa circumferential confining pressures.The results show that when the confining pressure increases from 1MPa to 10MPa,the average normal force of cutters increases from 35.2kN to 43.2kN,the increase rate reaches 22%,while the rolling force average decreases from 10.8kN to 8.8kN,however,the side force changes little.
其他文献
本文通过刘家峡大桥风洞试验,研究栏杆封闭组合气动措施对气动性能的影响。采取有效的气动措施后,气动导数 A2*由正转负,形成了气动阻尼,使桥梁断面的总阻尼增大,颤振频率减小,颤振临界风速提高。大桥的颤振为阻尼驱动型,系统扭转牵连运动占主导地位。栏杆封闭组合气动措施作用机理是通过增大扭转运动产生的A 项气动正阻尼和减小扭转牵连耦合运动产生的D 项气动负阻尼两种途径来改善桥梁断面颤振性能。栏杆封闭组合气
长大桥梁加劲梁由于体型硕大,架设安装需要的吊装设备与移运通道要求高,常规的钢梁安装均采用吊装设备水中垂直起吊安装和支架荡移上岸安装的方法完成。针对驸马长江大桥桥址处高陡岸坡区域条件,首次采用跨缆吊机与永久吊索连续荡移钢箱梁,完成钢箱梁从运输船到岸坡区域的安全快速转运,这一思路是对现有技术的重大突破,无支架施工避免了对岸坡环境的破坏,减少了临时钢结构水上安装拆除工序。本文介绍了该创新方法的原理与关键
This paper adopted orthogonal test method to develop a design methodology for a railway tunnel engineering.This paper mainly focuses on the influences of the deformation in the process of tunnels dyna
在频域内建立列车-轨道耦合振动模型,分别采用有限元法和声学边界元法研究高架钢弹簧浮置板轨道减振降噪特性.以某城市轨道交通30m 简支箱梁的现场试验数据为依据,对所建模型进行了验证.在此基础上,对比了分别采用普通板式轨道和钢弹簧浮置板时的箱梁振动和噪声,并探讨了钢弹簧浮置板参数的影响规律.结果 表明:仿真分析与测试结果吻合良好,箱梁振动声辐射主要集中在频率50~125Hz;相比普通板式轨道,钢弹簧浮
Lining crack is the most common defect in road tunnel,and it is difficult for tunnel engineers to evaluate the safety status of lining structure with cracks accurately.In accordance with mechanical an
该隧道工程具有长、大、深、难的特点。地下水对隧道施工构成威胁,并引起诸如塌方、冒顶、突水等工程问题。地下水赋存具有离散性,渗流具有各向异性等特点。通过UDEC 软件对米仓山隧道可能发生岩溶突水的区段进行了数值模拟分析,得出该区域富水性较弱,经过严格的施工和严密的现场监测,能保证该隧道此区域的安全。
针对某大直径泥水盾构越江隧道,按照分区施工控制的理念,根据地质条件、周边环境、隧道线型等将越江隧道划分为五个区段,总结各区段的特点并提出针对性的施工控制技术。根据地层特点提出了盾构机刀具加强方案,提出了考虑分区适应性的泥水管路技术参数计算方法,根据各区段的特点和特殊节点的技术要求提出了泥水压力、同步注浆填充率、推进速度等关键盾构掘进参数。实践表明,盾构越江施工效果良好,研究所提出的分区施工控制技术
以武汉地铁8 号线越江盾构工程为研究对象,通过PFC2D 软件,建立了可考虑超挖刀影响的盾构姿态调整的2 维离散元数值模型.对不同超挖率、超挖方向以及上覆荷载时超挖刀对盾壳受力的影响进行了模拟,分析研究了盾构在姿态调整过程中的受荷变化规律和可调整的极限范围,模拟计算结果表明:1)超挖率越大,土层对盾构在移动的负方向的作用力越小,适当增加超挖率可以扩大盾构姿态调整的范围;2)土层在水平方向具有对称分
动态设计方法对隧道工程的重要性不言而喻。然而,利益分配与协调管理机制的不完善、岩土体的复杂多变特性,致使隧道工程的动态设计仍处于尝试阶段、相关理论亦不成熟。基于理论分析与试点工程总结,针对节理发育地层,将隧道支护动态设计方法划分为预分析、支护参数的初步调整、节理特征的精细化描述、支护参数的优化分析4 个步骤,并明确各阶段的实施要点。依托井冈山、桦树墕等隧道,开展试点工程,阐述动态设计方法的实施流程
全-强风化花岗岩广泛分布于我国南部,其受工程扰动后遇水极易崩解破坏,给该地层中的地下工程建设造成严重阻碍。本文基于响应面法,通过室内崩解试验、单轴压缩试验及直剪试验,获得全-强风化花岗岩含水率、密度、黏土含量、粒径范围四因素对土体崩解特性的作用规律以及崩解时间的二次回归方程,并通过单轴压缩试验、直剪试验结果拟合全-强风化花岗岩土样崩解特性与宏观力学性能的量化关系,研究结果将为该地层的注浆工程中注浆