论文部分内容阅读
本文以贵阳伊顿公馆项目为案例,简要的介绍了伊顿公馆项目的项目概况及岩溶地区常见不良地质条件的处理方法,较深入地分析了贵阳伊顿公馆在建设过程中遇到的主要工程地质问题及采用的地基处理方法。
This article takes the Guiyang Eaton mansion project as a case, briefly introduces the project overview of the Eaton mansion project and the treatment methods of the common unfavorable geological conditions in the karst area, and analyzes the major engineering geological problems encountered in the construction of the Eton mansion in Guiyang. Ground treatment method used.