Risk assessment of bridges with partially or fully closed lanes

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:ddnihaoba
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  As a relatively new structural performance indicator,risk has been gradually paid more attention in recent decades.Different from other commonly used structural performance indicators,such as reliability and redundancy,which mainly deal with the structure itself,risk also takes into consideration the social and economic consequences caused by structural damage or collapse.Although it is a difficult task to estimate these consequences,research on risk assessment moved gradually from qualitative toward quantitative in order to provide additional information to decision makers during risk mitigation stage.
其他文献
期刊
期刊
  In recent years,a number of fatigue cracks have been found in orthotropic steel decks.The cracks are expected to grow and the number of total cracks will al
会议
期刊
  As pointed out by Castel [1] in case the reinforcement is corroded,the reducing of reinforcement area and the decreasing of bond strength and rigidity betwe
会议
  Raising and escalating concern in the bridge scour issue recently comes of extreme weather and population increment.Bridge damage caused by scour is even mo
会议
我把嘴里最后一口牙膏泡沫吐出来的时候,又看了一眼挂在洗衣水泥池子上面的“扯历”.这样的一本“扯历”,放在任何一个稍微发达的地区大概都可以看作是一种史前遗迹,它是我妈
期刊
期刊
期刊
  Modem slender structures are subjected to high stress ranges when subjected to live load,hence higher vulnerability to fatigue failure can be assumed.Struct
会议