基于要素的建设项目协同管理研究

被引量 : 0次 | 上传用户:dingwenpeng
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Each kind of problems which existed in the present project management are simple summarized, and the basic reason lies in various problems of project management is the essential factors lacks of effective conformity and coordination. Starting from the coordination essence obtained in the human society, the intrinsic demand to synergic management in the construction management is analyzed. After analyzing the project coordination in the cooperation management, partnering model, the synergic degree of all different construction patterns are analyzed separately.Firstly, the grey forecast and optimal decision-making on the total life cost of construction project is build, and the whole life cycle time, quality and cost goal of the construction project is resolved. According to the basic thought of the project integration, all materials, information and data in all different phases needs to be integrated. And a new method that applies the grey forecast approach to the cost prediction and the time optimization is proposed in this paper. Through analyzing the relationship of time, quality and cost, the reasonable area among these three major goals of the project is determined qualitatively. Recurring to the network planning technology, its object function and restrictions are explained carefully to obtain the most satisfied decision scheme and to control goals in the project management.Secondly, the SIPOC model of the construction project integration is proposed, and the organization structure to support this model is designed. Learning from the basic thought of the SCM, the Suppliers—Input—Process—Output—Customers (SIPOC) model of the construction project integration is proposed, and how to carrying on SIPOC model within the inter-construction project is discussed deeply. The dynamic united organization is established, which composed by construction participants and undertakes corresponding responsibility. The seamless link between different procedures of construction project is supported through the dynamic adjust. Based on the reality of construction project, the key-leading group of the dynamic united organization is analyzed. Finally, the application and benefits of this model is illuminated combined the development practice of one Shenzhen Building. Thirdly, the information asymmetry existed in construction project is analyzed, and the information sharing mechanism and realization methods are put forward. After the two layers principal-agent relationship among the owner, contractor and supervisor in the building phase of construction project is analyzed, the game model among the owner, contractor and supervisor is established. Through designing the rational management contract, utilizing the believable punishment threaten the contractor and supervisor, the contractor and supervisor can be impelled to work hard and reduce its possibility of conspired. The information integration model of construction project is established from the stage information integration and the participant integration. And the realization of the information integration model is designed from the selection of network structure, the planning of system application layer, the designing of database, etc. After the information processing procedure model of the information integration system is explained, every functional management integrated method of the construction project is suggested.Lastly, the synergic analysis model under and between the construction time, process and infarction is set up. The construction project management goal contains the expense, the quality, the security, the environmental protection and so on, these project goals realizations need to integrate and coordination all essential factors involved in the construct management, especially the time, the flow and the information factor. It needs to uses the quantitative analysis and the qualitative analysis, in the concrete analysis time, the flow and in the information essential factor integration foundation, to realizes the best control in the project expense, quality, security, environmental protection through the time, process and information synergic. While analyzes the various essential internal coordination of each factors and the external coordination between these factors and the market environment quantitatively, the concrete plan is provided to realizes the construction goals synthesis optimization.
其他文献
针对智能视觉监控系统中的运动目标轨迹分类问题,提出了一种基于多维Hausdorff距离的轨迹聚类算法。该算法使用流矢量序列描述目标运动轨迹,由多维Hausdorff距离进行轨迹相似
现有晶闸管仿真模型虽能较准确地模拟单只晶闸管开通和关断的动态过程,却较少涉及多只器件的串并联仿真。文中在分析晶闸管开关过程中动态特性的基础上,利用统一离散时域建模
项目PPP融资模式在中国公共事业项目管理中的成功应用说明实现投资渠道多元化,特别是吸引国内外民营资本进入公共事业项目化管理领域是加快我国公共事业项目管理发展的必由之
高频化、高功率密度和高效率,是DC/DC变换器的发展趋势。传统的硬开关变换器限制了开关频率和功率密度的提高。移相全桥PWM ZVS DC/DC变换器可以实现主开关管的ZVS,但滞后桥
De Beers在5月29日宣布2018年9月份要开始销售CVD合成钻石,这打破了De Beers自己长久以来的政策:研究生长合成钻石只用在工业上,不会做成首饰钻石销售。他们将以Lightbox Jew
——李少华,已经死了。——啊!?——这不是李少华吗?——这不是那个李少华!——那钱呢?——钱呢?一那一个亿?——不给了!但是,我会让工厂开工,农民种地,商店营业。想过好日子
期刊
淮河作为国家“九五”期间重点治理的“三河三湖”之一,自20世纪80年代以来,水质逐渐恶化,一直受到社会的关注。随着工业化,城市化的进程的加快,淮河水域受到严重污染,生态环境破坏
<正>检察新闻宣传是党的新闻工作的重要组成部分,是检察政治工作的基本内容,在整个检察工作中发挥着重要的舆论导向作用。宣传中抓好保密,是检察新闻宣传必须遵循的重要原则,
从监理角度出发,以风险管理理论为基础,结合建设项目监理过程的特点,对建设监理的风险管理方法与应用进行了深入的研究。以风险管理工作程序为主线,针对监理的特点系统探讨了监理
构建了2个装载不同填料的厌氧污泥床(UASB)反应器(R1:载活性炭的K3填料;R2:普通K3填料),对比研究了2种厌氧氨氧化系统的启动特征、脱氮性能,分析了R1反应器的微生物群落结构变化