论文部分内容阅读
平煤八矿选煤厂于1985年建成投产,生产的精煤质量好、品种俏,深得国内外用户的好评,先后出口韩国、日本、香港等国家和地区,创造了很好的经济效益。但在为国家创造财富的同时,却对周边环境造成了严重污染。为扩大生产能力,该厂于1989年兴建了外来原煤受煤系统,入洗原煤矿点多、煤种杂,并且随着采煤机械化程度的提高,入洗原煤的泥量远远大于设计能力,使该厂的洗水工艺澄清和煤泥回收等设施能力严重不足。再加上周边村庄的农户在煤泥水处理设施前的管道
The Pingdingshan Baili Coal Preparation Plant was put into operation in 1985. The quality of the refined coal produced is good and the variety is very good. It has won the praise of users at home and abroad. It has exported to South Korea, Japan, Hong Kong and other countries and regions and created very good economic benefits . However, while creating wealth for the country, it has caused serious pollution to the surrounding environment. In order to expand the production capacity, the plant built an external raw coal receiving coal system in 1989. The original coal mined and coal mixed, and with the increase of coal mining mechanization, the amount of mud into the raw coal is far greater than the design capacity , So that the plant’s clarification and washing water slime recovery facilities such as a serious lack of capacity. Coupled with the surrounding villages of farmers in the pipeline before the slime water treatment facilities