低温支架安装施工进度影响因素分析

来源 :中国石油和化工标准与质量 | 被引量 : 0次 | 上传用户:gtlclx001
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
低温支架主要用于承受载荷及管线绝热保温,广泛应用于液化天然气接收站。根据LNG项目投产运营经验,码头、储罐以及火炬区域低温支架安装施工,是顺利接卸首艘LNG运输船基本条件。本文主要针对固定支架现场施工情况及安装施工进度进行具体分析及总结,从结构设计、供货计划以及组装方式等方面展开讨论,明确影响安装施工进度的因素,以便提前预防及全程控制。 Low-temperature support is mainly used to withstand the load and pipeline insulation, widely used in liquefied natural gas receiving stations. According to the commissioning and operation experience of LNG project, the installation of low-temperature support for the wharf, storage tank and torch area is the basic condition for the smooth handling of the first LNG carrier. This article mainly analyzes the construction situation of fixed support and the progress of installation and construction, analyzes and sums up the construction progress from the aspects of structure design, supply plan and assembly method, and clarifies the factors that affect the installation progress in order to prevent and control in advance.
其他文献
通过实地调查访谈,专家座谈会等方法以及对90名2013届高职汽修专业毕业生发放调查问卷,对学生的就业能力做出了调研分析,为高职提升学生就业能力提供针对性的指导和相应的实践依
市政工程处于市区内,均属于线型工程,影响控制因素很多:如地上及地下障碍物、交叉作业、施工作业点多而且分散、工期短质量要求高等。所有这些因素都直接或间接地影响着工程造价
本文对博物馆加强图书资料保护的重要性和必要性进行了深入的探讨,详细分析了博物馆图书资料毁损的人为原因,并有针对性地提出了预防图书资料人为毁损的有效方法和对策。 Th
本文阐述了高层建筑中混凝土结构的优化设计的原则,探讨了高层建筑混凝土的结构设计。
随着油藏持续产建开发,注水系统逐渐无法满足边远注水井达标配注。针对吴420、元48、五里湾等开发区块局部注水半径过大,注水系统能力不足导致末端欠注现象,通过铁六增、旗九
海上钻井系统的顶驱液压系统是一个辅助系统,它如果发生故障,就会影响到顶驱的正常工作。本文对顶驱液压系统故障进行了简单的分析,并提出了一定的措施。 The top-drive hyd
随着油气勘探逐渐转向深部复杂地层,对钻井技术提出了更高的要求,在欠平衡钻井技术和动力钻井等技术上进一步发展,提出了自适应控制压力钻井关键技术。自适应控制压力钻井技
随着石油、天然气需求量的不断增长,贸易量也随之不断增大。因此对于长输管道的需求量越来越大,此类管道具有大管径、厚壁、高钢以及高压等特点。本文简要介绍了长输管道焊接
锅炉一直是作为能量转换输出的设备,它通过对水进行加热使其产生热能,经过锅炉的转换,将热能以蒸汽或是高温水等形式输出。影响锅炉热能是否能够高效输出的原因有很多,其最主
本文结合作者多年工作经验,主要指出了油气储运设备当前存在的问题,并针对该类问题提出了几点管理以及维护措施,希望抛砖引玉,能够为同行工作者提供参考借鉴。 Based on the