京包兰通道是我国北部路网主通道,其集包段还是我国重要的煤炭外运通道,既有线运输能力日趋饱和亟需改造,集包铁路通道运输需求的特征为客运快速、货运大能力,新建集包三四线不仅提高了通道运输能力和运输质量,而且完善了路网结构,意义重大。从京包兰铁路通道功能定位的分析入手,依据客货运输需求分析确定集宁至包头段通道建设目标,进一步研究新建线与既有线的运输分工方案,根据运输分工方案来确定新线的建设标准,提出三大运输分工方案,即新建客专、货专、客货共线铁路,新线与既有线分工协作共同承担通道客货运输需求,从运输能力及运输质量、工程投资及经济性、施工干扰、建设时机及工期、路网发展、运输组织灵活性等方面综合分析,提出新建线按照客货共线标准建设的推荐意见。
Beijing Baoling Channel is the main channel of Northern China’s road network. Its collection section is also an important coal transportation channel in China. The capacity of both existing and existing railways needs to be rebuilt. The characteristics of transportation demand for rail transit are fast passenger transportation, The newly built package of the 3rd and 4th lines will not only improve the transport capacity and quality of the corridors, but also improve the road network structure, which is of great significance. Based on the analysis of the functional positioning of the Beijing-Baotou-Lanzhou railway corridor, the goal of Jining-Baotou passage construction is determined according to the analysis of the demand for passenger and freight transportation, the transportation division of labor between the new construction and the existing one is further studied, and the new construction of the new lane is determined according to the transportation division plan Standard, put forward three major programs of transport division of labor, that is, new passenger transport, freight transport, passenger and freight line railway, the new line and existing railway division of labor co-commitment to channel passenger and freight transport needs, from the transport capacity and transport quality, project investment and economy , Construction disturbance, construction timing and duration, road network development, transportation organization flexibility and so on, and put forward the suggestions on the construction of new line in accordance with the standard of passenger and freight line.