老石坎水电站2号机组额定容量800kW,由于原设计中选用水轮机设计水头太高,造成机组长期偏离设计工况运行,效率低下,出力严重不足,经济效益较差,因此于1997年2月,对2号机进行改造,更换新型号转轮增加过流量,提高效率和出力;更换导水机构为加大转轮直径腾出空间;调整尾水管型线,加大尾水管水平部分,增加一段扩散管,并将尾水管倾斜插入尾水渠,提高动能回收率。改造总投资23万元,通过改造提高出力156kW,单位千瓦投资1474元,改造一年就收回全部投资,取得可观的效益,表1个。
The unit capacity of Unit 2 of Laoshikan Hydropower Station is 800kW. Due to the head of the turbine designed for the original design is too high, the unit will run away from the designed condition for a long time, which results in low efficiency and serious output. Therefore, in February 1997, 2 machine to transform, replace the new model runner to increase over-flow, improve efficiency and output; replace the guide mechanism to increase the runner diameter make room; adjust the draft tube line, increase the horizontal part of the draft tube to increase a period of proliferation Pipe, and tail pipe tilt into the tailrace, improve kinetic energy recovery. The total investment is 230,000 yuan, 156kW is increased through reconstruction, and 1,474 yuan is invested in kilowatts. After a year of reform, all investments will be recovered and a considerable profit will be achieved.