论文部分内容阅读
最近阿根廷和联邦德国联合企业已完成了PHWR300,一种功率在275Mwe—380MWe之间的加压重水反应堆的详细设计。该设计以成熟的技术为依据,特别适合技术转让。
The recent joint venture between Argentina and the Federal Republic of Germany has completed the detailed design of the PHWR300, a pressurized heavy water reactor with a power between 275 Mwe and 380 MWe. The design is based on proven technology and is particularly suitable for technology transfer.