论文部分内容阅读
泉水电站位于广东省乳源县南水河支流汤盆水上游,是南水河第一级电站,装机容量2.4×10~4千瓦,库容2×10~7立方米。坝址河床狭窄,岸坡约呈45°,二岸基岩大片出露,岩石为中粗粒斑状花岗岩。右岸坝肩上部由于受东西向冲沟切割,地形较单薄,顺坡裂隙发育。主要断层F_1,产状N85E。断层带通过河床4~#~7~#坝段底部。
Spring Hydropower Station is located in the upper reaches of Tang Basin, a tributary of Nanshui River in Ruyuan County, Guangdong Province. It is the first-stage power station of Nan Shui River with an installed capacity of 2.4 × 10 ~ 4 kilowatts and a storage capacity of 2 × 10 ~ 7 cubic meters. The riverbed of the dam site is narrow with a bank slope of about 45 °. A large amount of bedrock rocks are exposed on the second bank and the rocks are medium-coarse granuliform granites. The upper dam right shoulder due to the east-west gully cutting, the terrain is relatively thin, along the slope fissures. The main fault F_1, producing N85E. The fault zone passes through the bottom of the dam 4 ~ # ~ 7 ~ # dam.