阐述高速客运专线接触网钻孔桩基础施工存在的主要问题,并对其产生的原因进行分析,探讨了在施工中应控制的要点及可采取的控制措施,以满足桩基施工质量及接触网支柱安装要求。
The main problems existing in the construction of the catenary bored pile foundation for the high-speed passenger dedicated railway line are described and the reasons for the problems are analyzed. The key points to be controlled and the control measures to be taken in the construction are discussed to meet the requirements of the construction quality of the pile foundations and the catenary Pillar installation requirements.