论文部分内容阅读
阐述了汾河二库碾压混凝土大坝现场压水试验及钻取芯样的过程,通过压水试验和芯样的外观及物理力学指标的检测,充分说明了汾河二库大坝碾压混凝土的施工质量达到国内外领先水平。
The water pressure test and core drilling process of the Fenhe II reservoir are introduced. Through the test of water pressure, the appearance of the core sample and the detection of the physical and mechanical indexes, it is fully demonstrated that the Fenhe second reservoir dam is rolled Construction quality of concrete at home and abroad leading the level.