论文部分内容阅读
讨论了多目标优化生产作业调度计划系统的结构及主要功能,分析了该系统如何把多目标优化启发式算法、仿真模型及工作日指派相结合,从而实现了生产作业调度计划的动态优化编制及快速修改或重排。
The structure and main functions of the multi-objective optimization job scheduling system are discussed. It is analyzed how the system combines the multi-objective optimization heuristic algorithm, the simulation model and the assignment of working days so as to realize the dynamic optimization of production scheduling. Quickly modify or rearrange.