青海黄河公伯峡水电站是国家“十五”重点工程、西电东送启动项目,位于青藏高原海拔2010m的黄河干流上,是以发电为主,兼有防洪、灌溉的大Ⅰ型工程,是黄河上第一座、海拔最高的百万千瓦级钢筋混凝土面板堆石坝。工程枢纽由拦河大坝、引水发电系统及泄水建筑物组成。最大坝高132.2m,总库容6.2亿m~3,装机容量5×300 MW,总容量1500MW。工程概算总投资62.57亿元,决算总投资55.2亿元。工程于2001年8月开工,2006年8月竣工。
Qinghai Yellow River Gongboxia Hydropower Station is a national “15 ” key project, west to east to start the project, located in the Qinghai-Tibet Plateau elevation of the main stream of the Yellow River in 2010m, is based on power generation, both flood control, irrigation, large Ⅰ project , Is the first one on the Yellow River, the highest elevation of one million kilowatts of reinforced concrete face rockfill dam. The project is composed of a dam, a diversion system and a drainage structure. The maximum dam height is 132.2m, with a total storage capacity of 620 million m 3, an installed capacity of 5 × 300 MW and a total capacity of 1,500 MW. The total estimated investment of 6.257 billion yuan project, a total investment of 5.52 billion yuan. Construction started in August 2001, completed in August 2006.