论文部分内容阅读
以冲河桥 (二 )站受回水顶托、无流量测次期间的流量推求为例 ,提出以顶托直线为分割线 ,分层计算合成流量的方法
Taking Rushuqiao (B) station as the backwater support and the traffic flow during non-flow measurement as an example, a method of stratified calculation of the synthetic flow by using the straight line as the dividing line is proposed