一、“九五”期间,四川省铁路建设完成的主要内容 1.完成“八五”重点建设项目普(济)乐(坝)铁路,隆(昌)沪(州)铁路的建设收尾工作,并开通运输。其中,普乐铁路长24公里,项目总投资为1.46亿元;隆沪铁路长55公里,总投资1.76亿元。 2.建成了四川省地方铁路调度指挥中心(总投资6000万元)。 3.完成了与铁道部合资建设的达成铁路,宝成复线。承担了铁道部投资的成昆电化、渝达铁路电化、成都枢纽西环线建设期间的协调、配合工作。
I. Main Contents of Railway Construction Completed in the Period of the Ninth Five-Year Plan 1. To finish the construction of the completion of the Pu (JI) Le (Dam) Railway and Long (Chang) Shanghai (State) Railway in the key “Eighth Five-Year Plan” And opened to transport. Among them, Pleasure Railway 24 km long, the project total investment of 146 million yuan; 55 km long railway in Shanghai, with a total investment of 176 million yuan. 2. Sichuan Province built a local railway dispatching command center (a total investment of 60 million yuan). 3. Completed a joint railway construction with the Ministry of Railways, Baocheng double line. Undertake the Ministry of Railways investment in Chengdu Kunming, Yu-Da Railway electrification, Chengdu hub west ring construction period of coordination and cooperation.