论文部分内容阅读
在上海世博会倒计时279天之际,7月26日上午10点22分,随着顶部最后一根钢结构缓缓就位,国家电网企业馆提前36天实现钢结构封顶。当日,国家电网馆还宣布将2010年7月26日定为上海世博会国家电网企业馆日。国家电网世博企业馆占地面积为2520平方米,总建筑面积6228.4平方米。
279 days countdown on the occasion of the Shanghai World Expo, July 26 at 10:22, with the last of the top steel structure slowly into place, State Grid Enterprise Pavilion 36 days ahead of schedule to achieve steel structure cap. The same day, the State Grid Museum also announced July 26, 2010 as the Shanghai World Expo State Grid Corporation Day. State Grid Expo Hall covers an area of 2520 square meters, with a total construction area of 6228.4 square meters.