澜沧江干流出境水量分析工作是我国对外协商谈判所需的重要基础性工作之一。一年多以来,委属有关单位密切配合,抓紧工作,提出了《澜沧江干流出境水量分析报告》(中间成果)。为广泛听取意见,保证成果质量,根据委领导的指示精神,委副总工程师董德化及委规划技术处、勘测设计研究院有关负责同志于8月2日赴京向水利部水利水电规划设计总院汇报上述的中间成果。
The analysis of the water flow in the exit of the Lancangjiang main stream is one of the important basic tasks required for our country’s external negotiation and negotiation. In the past year or so, the relevant units have been closely cooperating and working hard to come up with the “Report on the Analysis of the Water Flow Out of the Mainstream of the Lancang River” (Intermediate Result). To widely listen to opinions and ensure the quality of the achievements, according to the instructions of the leaders of the Commission, Dong Dehua, deputy chief engineer of the Commission, and the responsible technical department of Planning and Design Institute and Survey Design and Research Institute went to Beijing on August 2 for water conservancy and hydropower planning and design institute Report the above intermediate results.