论文部分内容阅读
油气田地面工程是油气田开发生产的重要组成部分,其水平将直接影响到油气田的总体开发效益。“七五”期间,油气田地面工程建设有很大发展,技术水平显著提高,基本满足了油气生产的需要。“八五”期间和今后十年是我国石油工业发展的关键时期,油气田地面工程如何适应石油工业发展的新形势,既是严峻的现实任务,也是今后一个时期的技术发展方向问题。本文就这一问题谈几点意见。 1 加快老油气田地面生产系统的技术改造据初步规划,“八五”期间,油气生产任务主要靠已开发的老油气田完成,而这部分油气田大多已进入高含水、高能耗开采阶段。预测
Oil and gas field engineering is the development and production of oil and gas fields an important part of its level will directly affect the overall development of oil and gas benefits. During the “Seventh Five-Year Plan” period, the construction of oil and gas ground projects has greatly developed and the technical level has been significantly raised, basically meeting the needs of oil and gas production. During the “Eighth Five-Year Plan” and the next ten years, it is a crucial period for the development of China’s oil industry. How oil and gas ground engineering can adapt to the new situation in the development of petroleum industry is both a serious realistic task and a technical development direction in the coming period. This article talk about this issue a few comments. 1 Accelerating technological transformation of ground-based production systems in old oil and gas fields According to preliminary planning, during the period of the Eighth Five-Year Plan, the task of oil and gas production will mainly be completed by the developed oil and gas fields, and most of these fields have entered the stage of high water cut and high energy consumption. prediction