论文部分内容阅读
白山水电厂位于松花江上游, 是1 座一厂两坝三站的大型梯级水电厂, 总装机容量为1 700 M W。该梯级电厂由白山电站和红石电站组成, 白山电站由于建设较早, 虽也采用了计算机监控技术, 但因受当时技术水平所限, 应用情况不理想, 尤其是基础自动化存在问题较多, 难以满足当前“无人值班”( 少人值守) 的要求。为此, 从1996 年起对全厂整个自动化工程进行了技术改造, 主要包括计算机监控系统工程、光纤通讯系统工程和基础自动化改造工程。目前, 全厂整个自动化改造工程已基本完成, 并通过1 年多来的运行实践证明是成功的, 一些主要技改项目在新技术应用方面进行了大胆而有益的尝试, 为今后三峡等大型水电站的建设积累了宝贵经验。
Located in the upper reaches of the Songhua River, Baishan Hydropower Plant is a large-scale cascade hydropower plant with two hydropower stations and two hydropower stations. The total installed capacity is 1,700MW. The cascade power plant is composed of Baishan Power Station and Hongshi Power Station. Baishan Power Station also used computer monitoring technology due to its earlier construction. However, due to the limited technical level at that time, the application was not satisfactory. In particular, there were more problems in basic automation, Difficult to meet the current “unmanned” (less watch) requirements. To this end, from 1996 onwards, the entire plant of the entire automation project for technological transformation, including computer monitoring system engineering, optical fiber communication systems engineering and basic automation transformation project. At present, the whole factory automation transformation project has been basically completed, and through more than a year of operation proved to be successful, some major technological transformation projects in the application of new technologies made a bold and useful attempt for the future of the Three Gorges and other large hydropower stations The accumulation of valuable experience.