论文部分内容阅读
宁夏石嘴山电厂扩建工程4×330MW机组汽机为中压缸启动方式,使汽机控制中,对旁路控制系统的要求更高。为使汽机与旁路控制系统配合紧密,2号机组采用了新华控制工程有限公司的XDPS控制系统一体化设计,将旁路控制系统与汽机控制系统紧密结合在一起,满足了该机组对旁路系统的特殊要求,达到了理想的控制效果。
Ningxia Shizuishan Power Plant expansion project 4 × 330MW turbine steam turbine as the start mode, so that the turbine control, the bypass control system requirements higher. In order to make the turbine and bypass control system cooperate closely, Unit 2 adopts the integrated design of XDPS control system of Xinhua Control Engineering Co., Ltd., and combines the bypass control system and the turbine control system closely to meet the requirements of the unit to bypass System of special requirements, to achieve the desired control effect.