我厂生产的 X5525高速铣床,有两种三球杆零件。其中一种如图1所示。原生产三球杆工艺路线:铣φ38两端面→划线找中心→钻φ22D 底孔→车床上镗铰φ22D 孔成→立式钻床钻铰φ14D_4孔成→划φ14D_4孔端面。采用这种工艺路线,生产效率低,加工精度有时还达不到图纸要求。现采用如图2所示钻模,在摇臂钻床加工,只需一次装夹,完成钻铰φ22D 和φ14D_4孔成→立式钻床划φ22D 和φ14D_4孔端面。经检查φ22D孔中心线偏移球φ38中心
I produced the X5525 high-speed milling machine, there are two kinds of three clubs parts. One of them is shown in Figure 1. The original production of three-club process: milling φ38 both ends of the surface → crossed to find the center → drill φ22D bottom hole → boring machine boring φ22D hole into a → vertical drill drilling hinge φ14D_4 Kong Cheng → draw φ14D_4 hole end. Using this process route, the production efficiency is low, the machining accuracy sometimes can not reach the drawing requirements. Now use the drilling die as shown in Figure 2, in the radial drilling machine, just a fixture, the completion of drilling hinge φ22D and φ14D_4 into a → → vertical drill drilling φ22D and φ14D_4 hole end. After checking φ22D hole center line offset ball φ38 center