介绍了尿素装置ACES工艺二氧化碳汽提塔旋流器安装施工的改进案例,结合具体的安装实施过程,通过对施工方法的改进,进一步提高检修质量、节约检修时间,并指出在安装施工过程中的重点环节的技术要求。
In this paper, an improved case of installation and construction of cyclone of ACES process carbon dioxide stripping column in urea plant was introduced. Combining with the specific installation and implementation process, the improvement of the construction method was further improved to improve the quality of inspection and save the time of overhaul. It was also pointed out that during the installation and construction Key points of the technical requirements.