论文部分内容阅读
一、前言上海第二钢铁厂在引进高速线材轧机时,选择了以购买美国摩根/友升公司新设备为主,其余利用旧改新设备的方案,加热炉系统采用美国戴维—麦克公司与我合作设计并制造的方法。
I. INTRODUCTION Shanghai No.2 Iron & Steel Plant chose to purchase the new equipment from Morgan / YOYO Company while using the old equipment instead of the old ones when it introduced the high-speed wire rod mill. The heating furnace system used the American David- Collaborative design and manufacture of methods.