论文部分内容阅读
马钢2500m~3高炉通过对渣铁沟进行技术改造,增加了主沟通铁量;通过加强铁口管理与维护,实现了零间隔出铁,满足了高炉强化冶炼的需要。
Masteel 2500m ~ 3 blast furnace through technological transformation of slag trenches, an increase of the main communication of iron; by strengthening the iron mouth management and maintenance, to achieve a zero interval of iron, to meet the needs of blast furnace smelting.