引滦尔王庄暗渠泵站十条输水管道处理工程分析

来源 :海河水利 | 被引量 : 0次 | 上传用户:toveyhzh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、工程概况尔王庄暗渠泵站是引滦工程中的重要枢纽,担负着向天津市人民及各行各业供水的艰巨任务。尔王庄暗渠泵站,采用半分离式布置,选用12CJQ~100型水泵七台;12CJQ~90型水泵三台,共十台水泵。泵房下游侧有十条输水管道,直径均为1.4米,其中位于泵房与压力箱之间布置着8条长 First, the project profile Seoul Wangzhuang underdrain pumping station is an important hub of Luanhe project, responsible for the Tianjin people and all walks of life to supply the difficult task. Seoul Wangzhuang underdrain pump station, the use of semi-detached layout, the selection of 12 CJQ ~ 100 pump seven; 12 CJQ ~ 90 three pumps, a total of ten pumps. The downstream side of the pump room has 10 water pipes, both 1.4 meters in diameter, which is located between the pump room and the pressure tank is arranged 8 long
其他文献
勘测工作是水利水电规划设计的基础。没有可靠的勘测资料和科学的地质分析成果,就不可能作出一个好的规划设计。在水利水电工程建设中,勘测队伍又总是披荆斩棘,走在前面,常
AIM:The imaging features of MRI and DSA,using the modelsof implanted and induced hepatoma,were investigated in rats.METHODS:CBRH3 cancer cells were implanted f
企业信息化建设绝不是一个可以直接套用的工具,每个企业以其独具特色的企业环境和文化理念对信息化建设提出了不同的要求。文章以山西四建集团有限公司费用管理信息化为背景,
AIM:To evaluate the therapeutic efficiency of Tumor NecrosisFactor-related Apoptosis-inducing Ligand (TRAIL) gene onhuman colorectal cancer cell line HT29.METH
非工程措施的内容及分类,世界各国不尽相同。中国水利学会根据国内外的实践,1984年11月在北京召开的非工程防洪措施学术讨论会上认为,主要内容是:洪泛区管理、分洪滞 The c
美国威洛·克里克坝是世界上第一座用碾压混凝土建成的重力坝。该坝最大坝高为49米,顶长521米,混凝土方量31万米~3。由于美国陆军工程师团采用碾压混凝土施工方法,大坝全部
“汉字”俗称“方块字”。其字形的源头,可以追溯到良渚文化玉的造型。从岩画到陶文到玉器刻符,虽然还没有形成完整的词句,却为后来文字的形成做了铺垫,或者说,中国文字是多
1985年5月25日至29日,水利水电建设总局会同中国水力发电工程学会金属结构专业委员会在富春江水工机械厂,主持召开了关于龙羊峡水电站泄洪底孔平面链轮事故检修闸门和偏心铰
布拉格语言学小组作为20世纪语言学史上最重要的语言学团体之一,其学术影响几乎渗透到当今语言学研究的各个领域。然而,国内以往对布拉格语言学小组历史的研究鲜有基于捷克学
本文以汉英对比的方式,立足汉英语语言事实,针对现代汉语中老生常谈的问题——字、语素的关系做一些梳理和辨析。笔者认为语素引入汉语研究,有着内外原因,既有一定积极意义,