北京市流域管理的“大部制”研究

来源 :北京水务 | 被引量 : 0次 | 上传用户:kevil2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
面对北京市流域“分割”管理的现状,流域统一性特征要求一体化的综合管理。研究在借鉴国外流域管理经验和模式的基础上,有针对性地构建了适合北京市流域情况的“跨职能、跨区域”的“大部制”综合管理模式;流域管理机构、流域决策委员会和咨询委员会的职责界定清晰后,将统一行使分散在水务、环保和规划等部门的有关管理职责。从而实现对流域的协同管理。 In the face of the status quo of “watershed ” division in Beijing basin, the unified characteristics of watersheds require integrated and integrated management. Based on the experiences and models of foreign basin management, this study constructs a comprehensive management model of “cross-functional and cross-regional” suitable for the situation of the basin in Beijing. The basin management agencies, Once the responsibilities of river basin decision-making committees and advisory committees are clearly defined, they will unify their management responsibilities scattered across the water, environment and planning sectors. In order to achieve the collaborative management of the basin.
其他文献
本文通过对高炉炉壳安装焊接过程监理实践的叙述,概括了高炉钢结构安装焊接监理的程序、方法和要点,为钢结构安装焊接监理工作提供借鉴。
随着我国工程建设效率的不断提高和轻型建筑的推广,混凝土的使用范围越来越广泛。配合比是混凝土的组成方式,是达到不同性能要求的方法。本文将就不同性能的混凝土在配合比上的
园林规划设计是一项综合的技能,它将美学、建筑学完美结合,体现着某种思想,并且适合人们放松心情。这种将美学思想实践与建筑中的技能,在园林设计中将会得到淋漓尽致的发挥。园林
分析了延庆区水生态文明城市建设的必要性和基础.制定了延庆区水生态文明城市建设的目标与总体布局,明确了创建水生态文明城市的30项控制指标,提出了6大类任务和措施,保障延
混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。
建设项目实施阶段,即通常讲的施工阶段,把设计图纸和原材料、半成品、设备等变成工程实体的过程,是建设项目价值和使用价值实现的主要阶段。所谓工程造价控制,就是在投资决策阶段
建筑施工阶段是建筑工程实体建造的关键阶段,是建设项目投资发生变化的重要时期。因此,建筑施工阶段的工程造价管理非常重要。文章结合实际工作从几方面对如何控制建筑施工阶段
本文将首先对计算机网络发展做简单介绍,接着探讨计算机网络辅助语言学习的应用及其优点,然后介绍当前英语学习方面的软件及网络的优势以及利用,最后分析当前英语教学中新的教学
膨胀土渠道边坡病害问题一直是工程界的技术难题,结合该渠段的地质和结构特点,分析了边坡病害出现的原因,总结了边坡病害防治的各种技术措施,为类似工程提供参考。 The dise
近年来,城市火灾的频发让大家对建筑材料的防火性能日益重视,而其实各种新型的防火建筑材料都通过各自不同的防火特性应用在了一些建筑当中,当然,由于各自属性的差别,它们的实际应