论文部分内容阅读
本文总结了我院水轮机能量试验台的建设和调试情况,从理论上对试验台部分装置的结构问题和测流系统堰上水位波动进行了初步分析,指出解决措施,并指出了尚待改进的方向。
This paper summarizes the construction and commissioning of turbine energy test rig in our institute. It theoretically analyzes the structural problems of some of the test rigs and the water level fluctuations on the weir of the flow measurement system, points out the solutions and points out the problems to be solved direction.