论文部分内容阅读
本文根据周边环境和地质条件及石料可以就地取材等情况,拟定坑口山塘采用重力坝的设计。此工程的建成将有效解决下游1300人的生活用水及小部分农业灌溉用水问题。
This article according to the surrounding environment and geological conditions and stone materials can be drawn on the spot and so on, to develop Hang Hau pond using gravity dam design. The completion of this project will effectively solve the domestic water supply for 1,300 people downstream and a small amount of agricultural irrigation water.