论文部分内容阅读
位于盐田区的夏盐2井,在井场、基础建设中就考虑了环境保护问题。用水泥筑成排水方便畅通的封闭式排水沟系统。用水泥和红砖筑成防渗沉砂池和废水池。废水、废浆、钻屑等废料,通过防污染措施先集中,后运往环保部门指定的地点。在钻井过程中采取有效的防污染措施,避免了钻井生产及生活中产生的废液渗入地下或流入井场以外的区域。实现了盐田区的清洁无害化生产,保护了盐矿资源。
Xiayan 2, located in Yantian District, has taken environmental protection into account in the wellsite and infrastructure. Built with cement drainage drainage system is convenient and closed gutter system. Built with cement and red brick impermeable grit chamber and waste pool. Waste water, waste slurry, drill cuttings and other wastes shall be firstly collected and transported to the designated place of environmental protection department through anti-pollution measures. In the drilling process to take effective anti-pollution measures to prevent drilling production and life of waste generated into the ground or into the area outside the well field. Yantian District to achieve a clean and harmless production, protecting salt resources.