桃树花前细心管

来源 :农家参谋 | 被引量 : 0次 | 上传用户:lvsby2007
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、施花前肥 在花蕾萌动前施花前肥,以磷钾肥和有机肥为主,5年生以上的结果树,每株施沤制腐熟的人畜禽粪8~10公斤,磷酸二氯钾0.5~1公斤,围绕树冠滴水线,挖深、宽各25~30厘米的环沟,将肥料施于沟内,盖土即可。 二、培土覆盖 施花前肥后,每株树培施沤制腐熟的垃圾肥、塘泥、火烧土或其它土杂肥80~100 公斤,从树冠滴水线外 25~30米处向内铺进 80~100厘米,并用稻草或其它来草将树盘覆盖住,草厚8~10厘米,以稳定和提高土温。 First, before the flowering of flowers before flower buds germinate in the pre-flowering fertilizer to phosphorus and potassium and organic fertilizer-based, more than 5-year-old tree results, each plant system of malnutrition, manure and livestock manure 8 to 10 kg of phosphoric acid dichloride Potassium 0.5 to 1 kg, dripping around the crown, digging deep, wide 25 to 30 cm ring ditch, the fertilizer applied to the ditch, covering the soil can be. Second, soil fertilization Before and after the fertilizer, each tree cultivation and cultivation of compost system waste compost fertilizer, pond mud, fire soil or other Tuza 80 to 100 kg, 25 to 30 meters from the crown drip line to the shop Into 80 to 100 cm, and use straw or other grass to cover the tree, grass thickness of 8 to 10 cm, in order to stabilize and improve soil temperature.
其他文献
2002年是“十五”计划的第一年,对核工业人来说也是核电建设的丰收年。日前,本刊记者专程走访了同时承担四座核电安装工程任务的核工业二三建设公司,公司总经理范群喜向记者
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
培养小学生数学核心素养并非一日之功.这与教师的努力是分不开的,我们教师要更新教育理念,把小组合作学习做到实处.让学生找到学习的乐趣,感受到数学和生活是密不可分的,进而
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1生产情况rn我公司1000t/d熟料生产线窑型为:Ф3.2m/3.5m×52m五级旋风预热器带KSV型分解炉窑外分解窑,配用Ф3.8m×13m圈流二仓水泥磨,且外进部分立窑熟料.rn
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
为挖掘种猪的繁殖潜力,提高养猪的经济效益,介绍种猪的饲养管理水平,包括种公猪的饲养管理、母猪选育和饲养管理、母猪繁殖疾病的预防、配种时机和方式等方面,以实现种猪管理