“七五”期间,石油工业承担着繁重的能源建设生产任务。目前,石油勘探开发和建设已进入一个新的历史发展时期,为适应这一形势的要求,石油基本建设必须着眼于到1990年生产原油1.5亿t、天然气150亿m~3、轻烃150万t这个总目标,必须在技术政策、技术路线上有一个大的改革。总结石油基本建设三十多年的经验,大力发展组装化、模块化、活动化是加快建设步伐、提高工程质量、降低建设成本的关键。党的十一届三中全会以来,1979年在镇海召开的基建会上,把改革和科技进步摆在了首
During the “Seventh Five-Year” period, the oil industry undertakes the heavy task of energy construction and production. At present, oil exploration, development and construction have entered a new period of historical development. To meet the requirements of this situation, oil infrastructure must focus on producing 150 million tons of crude oil, 15 billion cubic meters of natural gas, 1.5 million of light hydrocarbons in 1990, The overall objective of t must have a major reform in technical policies and technological routes. Summing up the 30 years of oil capital construction experience, vigorously develop the assembly, modular, and activity is to speed up the pace of construction, improve the quality of the project, reduce the cost of construction. Since the Third Plenary Session of the 11th CPC Central Committee, at the infrastructure construction meeting held in Zhenhai in 1979, the reform and technological progress have been put at the head