论文部分内容阅读
水电站安装高程的确定,是影响水电站投资的重要因素。水轮机吸出高度则直接影响安装高程的确定。众所周知,吸出高度H_s的简化计算公式为:
The establishment of hydropower station installation elevation is an important factor that affects the investment of hydropower station. The suction height of the turbine directly affects the determination of the installation elevation. It is well-known that the simplified formula for suction height H_s is: