新线按一次电化设计存在问题的商榷

来源 :铁道标准设计通讯 | 被引量 : 0次 | 上传用户:m6300
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新建铁路按一次电化设计,没有蒸汽(或内燃)过渡阶段,从目前我国的实际出发,对施工,临管确实还存在一些问题,现讨论如下。一、车站紧靠隧道的问题新建铁路按一次电化设计交付运营,顾名思义不存在蒸汽牵引问题,但是长大线路施工往往持续几年,例如,一条300~400公里的山区铁路,从开工到全线通车,工期常需3~4年,加上配套工程还要延长2年左右,这就是说蒸汽机车需使用几年。当车站紧靠隧道,用 There is still some problems in the construction and temporary management of the newly-built railway once it is electrified. There is no transition period of steam (or internal combustion). From the current reality in our country, the discussions are as follows. First, the station close to the tunnel problems New railway delivered by an electrochemical design operation, as the name suggests, there is no steam traction problem, but the growth of long lines often lasts for several years, for example, a 300 ~ 400 km mountain railway, from start to start , The construction period usually takes 3 ~ 4 years, and the supporting project needs to be extended for about 2 years, which means that the steam locomotive needs to be used for several years. When the station close to the tunnel, use
其他文献
为了解决铁路车辆车轴用新疆冬油供不应求的问题,进一步提高车轴油质量,根据铁道部、石油部1980年联合文件精神,以铁道部科学研究院金化所为主,有石油部独山子炼油厂、锦西
2012年6月16日上午,由中国客家博物馆举办的客家文化知识讲座——《客家方言与文化》在中国客家博物馆的报告厅举行,报告厅里座无虚席,来自梅县新城中心小学的100多位老师参
许多沿岸国的渔工曾认为,随着200海里渔区的实施,其资源问题大部分可以得到解决,有些国家已开始尝到甜头.而有些国家则在期待甜头的到来,挪威就是这样的国家.挪威自1977年1
近几年来,我场坚持种养结合,以种促养,边种边改,不断提高,科学地利用湖、塘水面,充分挖掘生产潜力,取得了良好效果,各项生产指标都有大幅度的增长。去年,我场利用现有地形特
目前,国际铁路联盟(МСЖД)正在进行数据传输《Γермес》联合自动化系统的试验。该系统包括英国、比利时、法国、西德、瑞士和意大利铁路,拟于1983年投入运营。在初
我场开展网箱养鱼试验是从今年七月开始,共设置四个网箱,计一百五十平方米,共投放三厘米长的鱼苗九千二百八十尾,十厘米长的鱼种四百五十六尾。通过七十余天的饲养管理,取得
单位简介:德国拜玛公司始成立于1842年,总部位于德国工业中心城市斯图加特市,是一家以纸浆和造纸技术以及固液分离技术为核心技术的家族企业。从20世纪70年代开始,德国拜玛公
水浮莲原野生于珠江三角洲一带的池沼、湖泊,解放后,随着养猪事业的发展,水浮莲很快成为我国南方广泛养殖的一种水生饲料,并且逐步北移到长江、黄河流域,直到华北、东北地区
《铁路电力设计规范》审查会由铁道部基建总局主持,于3月中旬在京召开。会议对规范送审稿认真地作了讨论。一致同意修改补充的主要内容有:①在运营后5年内,确有可利用的电源
铁道部科学研究院一九八二年共取得科技成果59项,其中属于部级鉴定的29项,属于基层级审查鉴定的30项。初步归纳为以下几个方面: 制动3项,占成果总数5.1%;电气化铁道3项,占成