吉林白山发电广一期工程安装3台300MW水轮发电机组,三台机组,尤其是2号机,在安装运行过程中相继暴露出一些缺陷或发生一些故障。专家组对电厂的生产中存在的问题提出了切实可行的处理意见:
Jilin Baishan Power Generation Project Phase I installed three 300MW hydro-generating units and three units, especially the No. 2 ones, which exposed some defects or some faults one after another during the installation and operation. The expert group put forward feasible suggestions on the problems existing in the power plant’s production: