在前期的钢覆面剥离工艺选择研究的基础上,确定使用冲击破坏焊口的工艺对切割后钢覆面进行剥离。选择以史丹利BR45型冲击扁铲为主要冲击剥离设备,通过3D建模仿真设计冲击锤安装支架(图1),使其可在钢覆面剥离专用设备原型机万向.陕换端以确定角度冲击地面、墙面、天花板处切口中未分离的焊口,破坏焊口后,钢覆面将可与安装龙骨分离,达到剥离的目的。为提高冲击剥离过程的稳定性,冲击剥离工具端与万向快换连接处使用减震块,降低冲击过程中的大臂振
Based on the previous research on steel cladding stripping process, it is determined that the steel cladding after stripping can be stripped by using the technology of impact fracture welding. Select Stanley BR45 impact flat shovel as the main impact stripping equipment, through the 3D modeling and simulation of impact hammer mounting bracket (Figure 1), so that it can be demolished in the steel surface special equipment prototype universal. Shanhaiguan to determine the impact angle Ground, walls, ceilings incision in the weld does not separate the destruction of the weld, the steel cladding will be separated from the installation of keel to achieve the purpose of stripping. In order to improve the stability of the impact stripping process, shock stripping tool side and universal quick change connection with damping block, reduce the impact during the boom