岩石冲刷

来源 :陕西水力发电 | 被引量 : 0次 | 上传用户:lyling0411
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文认为岩石冲刷是由顺着岩石面流动的水流所引起的.这种冲刷经常发生在溢洪道下游、泄洪陡槽、消力池以及导流隧洞和明渠中.本试验所根据的假定为:岩石在某些方向具有裂缝,并且水流能流进裂缝,使裂缝内水压力升高.当由于水流引起的压力作用在岩石块顶面的同时,裂缝内的水压力作用在岩块的侧面和底面.如果扬压力不能被岩块的重量所平衡,且裂缝内又没有其它力阻止其运动,则 This paper argues that rock scour is caused by the flow of water flowing along the rock face, and this scour often occurs downstream of the spillway, in spillway chutes, troughs, as well as in diversion tunnels and open channels. This test is based on the assumption that rock In some directions there is a crack and the water flow can flow into the crack causing the water pressure in the crack to rise.While the pressure due to water flow acts on the top of the rock mass the water pressure in the fracture acts on the side and bottom of the rock mass If the uplift pressure can not be balanced by the weight of the block and there is no other force in the crack to prevent its movement
其他文献
白山电站1号机组于1984年12月11日顺利完成了72小时连续带负荷试验。至此,哈尔滨电机厂为白山电站1期工程制造的3台300MW水轮发电机组已全部并网发电。1号机组经8次正式起机
现有文献仅仅从价值相关性和可靠性两个方面分析了公允价值计量的经济后果,而较少涉及到其他方面的经济后果。本文利用中国上市公司2007-2010年的数据,实证检验了公允价值计
在水利水电工程的施工开挖中,采用深孔爆破技术的前景非常广阔.因此,掌握这方面的知识,不断地加深对该技术的理解,借鉴国外有关的先进技术和经验,对于加速和高质量地开挖水
一、概况镜泊湖新厂,首部为地下式厂房。进水口系采用水下岩塞爆破施工方法,於1975年9月完成的,1977年第一台机组发电。为了防止污物进入发电洞内,影响机组安全运行,先采取
日本东京电力公司自1979年10月开始在枥木県今市的北部山区兴建一座装机为105万千瓦的大型抽水蓄能电站,厂房设在地下,其洞室宽33.5米、高51米、长160米,埋深400米,是目前世
一、形成洪水灾害的原因是多种多样的有暴雨形成的洪水(雨洪);有融雪造成的洪水(春汛);还有降雨兼融雪造成的洪水(俗称桃花汛),这种情况的次雨量的径流系数较大。我国北方,
建国以来,随着水利水电建设事业的发展,我国水利水电测量工作取得了很大成绩。据不完全统计,共完成一、二等精密水准测量9万多公里,三、四等水准测量29万公里;完成的各种比
近些年来,有机薄膜场效应晶体管(OTFTs)得到了快速的发展,但是载流子在薄膜中的传输机理以及如何有效地通过控制有机半导体层的形貌来构筑高性能的有机薄膜晶体管器件仍然是
上犹江水电站的主厂房设在空腹重力坝的溢流坝段内,与地下式或封闭河床式电站相似。装有4台1.5万kw竖轴水轮发电机组。这种坝内式厂房存在通风条件差、潮湿和噪声大三大弊病
小型水力发电设备在小水电开发中的应用,一般应当考虑以下几点:(1)由于小水电以追求年发电量为目的,故常采取和系统并列运行的方式;(2)对小型水力发电设备性能的要求,并不强