论文部分内容阅读
江西省良山铁矿,自1972年以来十分注重矿区的水土保持工作,坚持综合治理和连续治理的方针,做到有领导兼管,有专人负责,有专项经费,几年来共投资104万元用于矿渣尾砂的处理和矿区的绿化,有效地防止了新的水土流失。 他们的具体作法是:一、在矿山开采规划设计中,把弃土和尾砂的处理列入一项内容,作出防治水土流失的实施方案。二、修建一座库容为437万立方米的尾砂库,处理矿渣尾砂。对于已产生的348吨弃土,分别堆放在三个排土场,保证弃土不
The Liangshan Iron Mine in Jiangxi Province has paid great attention to soil and water conservation work in the mining area since 1972 and has adhered to the principle of comprehensive management and continuous improvement so as to be in charge of the leadership and control and have the responsibility of special personnel and special funds. In the past few years, a total investment of 1.04 million yuan For the treatment of tailings and green mining area, effectively preventing new soil erosion. Their specific practices are: First, mine mining planning and design, the spoil and tailings treatment included in one of the content, to prevent soil erosion implementation plan. Second, build a storage capacity of 4.37 million cubic meters of tailings ponds, slag tailings treatment. For the 348 tons of spoil that have been produced, they are respectively piled in three dump sites to ensure that spoil is not applied