1工程简介新疆塔西河石门子碾压混凝土拱坝最大坝高109m,坝顶高程1394.00m,建基面高程1285.00m,溢洪道及泄水孔布置在拱坝中部主河道上,以便泄洪时水流顺畅.坝体混凝土总方量21.1万m3.坝址地区冬季寒冷,月平均气温在零度以下长达5个月,多年平?
1 Project Profile The maximum dam height of Shimenzi RCC Arch Dam in Taxi River, Xinjiang is 109m with an elevation of 1394.00m and an elevation of 1285.00m. The spillway and spillway are arranged on the main channel in the middle of the arch dam for flood discharge Smooth water flow. The total volume of concrete in the dam is 211,000 m3. Dam area cold in winter, the average monthly temperature below zero in up to 5 months, many years of peace?