雁洲船闸坐落在第四系海陆交互相沉积(Q~(mc))的深厚淤泥上,地基土体强度低,压缩变形大,地震条件下可能产生震陷,其内夹砂壤土层还存在饱和砂土液化问题。为提高地基承载力,减小沉降量,消除砂土液化和震陷,需进行地基处理。经方案比较,地基处理选择了水泥土搅拌桩方案,采用格栅式布置,上闸首、闸室和下闸首置换率分别为35%、27.6%和33.9%,桩长12 m,桩径600 mm,桩体90 d抗压强度值不小于1.8 MPa。施工完成后,搅拌桩质量检测全部合格。
Yanzhou Ship Lock is located on the deep silt of Quaternary sea-land interaction facies deposition (Q ~ (mc)). The strength of foundation soil is low and its compressive deformation is large. It may cause the earthquake subsidence. Saturated sand liquefaction problems. In order to improve the bearing capacity of the foundation, reduce the settlement and eliminate the sand liquefaction and earthquake collapse, it is necessary to carry out foundation treatment. According to the scheme comparison, the cement-soil mixing pile scheme is selected for foundation treatment. The grid-type arrangement is adopted. The replacement rates of the upper gate, gate chamber and lower gate are 35%, 27.6% and 33.9% 600 mm, the pile 90 d compressive strength value of not less than 1.8 MPa. After construction, mixing pile quality inspection all qualified.