百色水利枢纽是珠江流域综合利用规划中治理和开发郁江的一座大型骨干水利工程,该项目已列入国家《国民经济和社会发展第十个五年计划纲要》,也是西部大开发的重要基础设施项目之一,工程自2001年10月主体工程开工以来,在水利部的关心支持下,经业主、设计、监理、施工单位的密切配合、共同努力,2002年10月实现了大江截流,2003年迎来了工程施工的高峰年。 目前,工程建设进展顺利,截止2003年6月底,累计完成投资119554万元,占工程总投资的22%;其中中央预算内资金32762万元,中央预算内专项资金35497万元,地方配套资金30046万元,国家开发银行贷款21249万元;累计完成土石方开挖690万m~3(其中土方280万m~3,石方410万m~3),占总工程量的123%,土石方填筑113万m~3,占总工程量的65%,混凝土浇筑77万m~3,占工程量的25%。
The Baise Multipurpose Dam Project is a large-scale backbone water conservancy project for the control and development of the Yujiang River in the comprehensive utilization planning of the Pearl River Basin. This project has been listed in the “Outline of the Tenth Five-year Plan for National Economic and Social Development” as well as an important infrastructure for the development of the western region Since the project started in October 2001, with the interest and support of the Ministry of Water Resources, the project has worked closely with the owners, design, supervision and construction units to work together. In October 2002, the river closure was realized. In 2003 Ushered in the construction of the peak year. At present, the construction of the project is progressing smoothly. By the end of June 2003, a total investment of 1,195,550,000 yuan has been completed, accounting for 22% of the total investment of the project. Among them, the funds within the central budget are 327,620,000 yuan, the special funds within the central budget are 354,970,000 yuan and the local counterpart funds are 30046 RMB210,400,000 was borrowed from China Development Bank, and borrowed by the State Development Bank amounted to RMB222,490,000. The accumulated excavation of earthwork amounted to 6.9 million m3 (including 2.8 million m3 of earthwork and 4.1 million m3 of rockwork), accounting for 123% of the total project volume. 1.13 million m ~ 3, accounting for 65% of the total works, concrete pouring 770000 m ~ 3, accounting for 25% of the project.