我处临黄大堤长194.5公里,计有险工12处、控护工程17处、坝岸工程653道(段),占堤防长的32.4%。这些工程和对岸工程配合,交错对峙,高村以上工程布点大体完成,使河势逐步有所控制,高村以下至陶城铺基本控制了溜势。总的看,经过多年洪水考验,这些工程对稳定河势、护滩固堤起到了明显作用。现对有关工程的坝型,方位和挡距,提出几点粗浅的意见,错误之处,请指正。
I am approaching the Yellow River Embankment 194.5 kilometers long, there are 12 dangerous workers, control and protection works 17, dam project 653 (paragraph), accounting for 32.4% of the length of the dike. These projects and the other side of the project, staggered the confrontation, high village project layout generally completed, so that gradually control the river, Takamura to Tao Chengpu basic control of the slide. In general, after years of flood tests, these projects have played a significant role in stabilizing the river regime and protecting the embankment. Now on the project dam, azimuth and pitch, put forward a few superficial opinions, errors, please correct me.