1994年中国大地天气反常,汛期来得早,洪水灾害接连不断,是近百年来少见的.七月初东勘岩土公司,到牡丹江上二道沟水电站工地进行水上钻探作业,历时70天,创产值120万元.汛期中水上钻探,情况瞬息万变,险情随时都可能出现,为确保安全生产,采取了以下安全措施:1.全员进行岗前培训,先培训后上岗.并由技术负责人进行安全技术交底.
In 1994, the weather in China was abnormal and the flood season came early and the flood disaster came one after another, which is rare in the last hundred years. In early July, the geotechnical company of Dongkang prospect went to the site of Shangdagougou hydropower station in Mudanjiang for water drilling, which lasted 70 days, 1.2 million yuan in flood season drilling in the water, the situation is rapidly changing, the danger may occur at any time, in order to ensure safe production, has taken the following safety measures: 1. The whole staff pre-job training, training and post-induction by technical officers for safety Technical submission.